QUIK-TUBE 8" × 48" building form
8" dia., 4' depth — fits hole exactly
×12
80 lb. concrete mix
~4,000 PSI; 3 bags/pier × 12 piers
36 bags
ABA ZMAX post base (4×4)
ZMAX galvanized; leveling nut on anchor bolt gives ½" vertical adjustment
×12
½" × 3¾" zinc-plated concrete wedge anchors (10-pk)
Post-installed after concrete cures (3–5 days); drill ½" hole ~4" deep; 12 needed
2 packs
Quikrete 50 lb. All-Purpose Gravel — pier drainage
Pier base drainage bed; ~1.3 bags per pier
16 bags
8" auger rental (4 hrs)
4' deep × 8" dia. holes; full-day $96 if needed
1
2×6×8' PT — long side beams (doubled)
UC4B; 3 boards/ply × 2 plies × 2 sides; Ply 1 joints at 8'&16', Ply 2 at 4'&12'
12 boards
2×6×8' PT — end caps
UC4B; cut to 6'
2 boards
2×6×12' PT — floor joists @ 16" OC
#1 Ground Contact; cut to 6' — 2 joists per board, zero waste; 14 interior joists
7 boards
Simpson Strong-Tie LUS26 joist hanger for 2×6
ZMAX galvanized; 2 per joist
×28
SD connector screw #9 × 1½" (100-pk)
Joist hanger fastening
3 packs
3/4" PT plywood 4×8 (non-T&G)
Ground Contact; run 8' along shed length; orient perpendicular to joists; stagger rows
5 sheets
Construction adhesive 10 oz.
Applied to joist tops before sheeting
3 tubes
#9 × 3" construction screws — 1 lb. box
Decking fasteners; ~65/box
5 boxes
Landscape fabric 4×50 ft.
Heavy PP woven weed barrier
1 roll
Cut-N-Treat wood preservative — 1 qt.
All field-cut PT ends immediately after cutting
1
Motovera self-leveling laser level w/ tripod
100ft green laser; use during pour to verify pier tops within ½" of each other
1
2×4×16' studs — front wall (cut to 13')
Kings/trimmers/cripples/sills for 2 doors + 3 windows; 3' offcuts cover cripples
×28
2×4×8' — front wall double top plate
2 runs × 20' = 40 LF → 5 boards
5 boards
2×4×8' — front wall bottom plate
20 LF → 3 boards
3 boards
Header lumber — doors & windows
DBL 2×10 (6' sliding door, 2 bd); DBL 2×6 (36" door, 1 bd); DBL 2×6 (×3 windows, 6 bd)
9 boards
2×4×10' studs — back wall
16" OC; 20' wall = 16 studs; no openings
×16
2×4×8' — back wall double top plate
40 LF → 5 boards
5 boards
2×4×8' — back wall bottom plate
20 LF → 3 boards
3 boards
2×4×16' studs — end walls ×2 (tapered)
Cut to 6:12 angle (26.6°); 6 studs/wall
×12
2×4×8' — end wall plates
Bottom + angled top; 2 walls × 2 × 6'
4 boards
2×4×16' studs — interior partitions ×2
Same taper as end walls; 6 studs/wall; bays at 6'8" and 13'4"
×12
2×4×8' — partition plates
Top + bottom; 2 walls × 2 × 6' = 24 LF
3 boards
OSB 7/16" 4×8 — structural wall sheathing
All walls; 20 sheets (~568 sq ft with 10% waste)
20 sheets
Tyvek HomeWrap — weather-resistive barrier
Over OSB before ACX; 2 rolls (990 sq ft); overlap 6" min, tape seams
2 rolls
½" ACX plywood 4×8 — exterior face
A-face smooth for paint; over Tyvek; prime all 6 sides before install; ~20 sheets @ ~$50 = ~$1,000
~20 sheets
3-1/4" × 0.131" galvanized framing nails (1,000-ct)
21° plastic collated; Freeman compatible; covers wall framing + beam lamination
1 box
2-3/8" ring shank coil nails (3,000-ct)
15° wire coil; OSB roof deck sheathing (coil nailer rental)
1 box
12d joist hanger nails 1-1/2" — 1 lb.
Hurricane tie fastening via palm nailer
2 boxes
½" × 4" hex galvanized lag screw (25-pk)
Back wall ledger; 18 lags needed
1 pack
Freeman PFR2190 framing nailer
21° plastic collated; wall framing + rafters
1
Freeman PMPN mini palm nailer
Hurricane ties, joist hangers, tight spots
1
1×2 battens — board-and-batten siding
Spacing TBD (6–12" OC); price TBD; nailed over ACX face
TBD
Rockwool Safe'n'Sound 3"×15-1/4"×47" (59.7 sq ft/bag)
Back wall only for sound; 20'×10'=200 sq ft → 4 bags; $83.98/bag. Sides & front: standard R-13 fiberglass later if needed
4 bags
2×8×10' rafters
6:12 pitch; cut to ~109" (16" front + 12" back overhang + 80.5" span); 16 rafters @ 16" OC along 20'
×16
2×8×12' — back wall ledger
20' → 2 boards
2 boards
2×6×8' — front fascia
20' + side overhang returns → 3 boards
3 boards
H2.5A hurricane tie
One per rafter each end; 16 × 2 = 32; order 36
×36
Pro Select R-Matte Plus-3 Polyiso 2"×4'×8' R-13.1
Roof insulation; cut to 14.5" strips for rafter bays; install before OSB deck; foil face toward interior
7 sheets
OSB 7/16" 4×8 — roof deck
~195 sq ft; 7 sheets with waste; install over rafters after foam insulation
7 sheets
Synthetic roofing underlayment
Do NOT use felt under metal; 1 roll covers 400 sq ft
1 roll
Union Corrugating Master Rib 3.17'×12' Charcoal Gray 29-ga Panel
Cut to ~112" (9'4") on site; 32" waste/panel; 22' total coverage (20' + 12" each side) → 7 panels; $59.98 each
×7
Union Corrugating #10 × 1-1/2" galvanized screws (100-ct)
~250–300 screws needed → 3 boxes
3 boxes
Master Rib foam closure strips — 4-pack
Solid foam; 2 packs eave (front) + 2 packs high side (back wall)
4 packs
50-ft butyl sealant tape
Under panel side laps; 6 laps × ~8.5' = ~51 LF; 1 roll sufficient
1 roll
F4.5 × 10-ft black aluminum drip edge — eave
Front low-side eave; ~22' → 3 pieces
3 pieces
F4.5 × 10-ft black aluminum drip edge — rakes
Two sloped side edges; ~8.5' each → 1 piece per side
2 pieces
2.5" × 10-ft galvanized Z bar flashing — back wall
High side junction; panel-to-wall seal; ~22' → 3 pieces
3 pieces
Coil nailer rental
15° wire coil; OSB roof deck sheathing day
1 day
Synthetic underlayment (400 sq ft)
Contractor grade 4'×100'; Home Depot
1 roll